Casey Construction are continuing to make good progress with the work.

Insulation work is now almost complete and plasterboard linings are being fitted.

Meanwhile, at the upper level, decoration work is progressing at the ceiling.

At the back of the balcony framing, insulation and plasterboard linings coming along well.
And in the roof space- insulation has been fitted.
The whole building is being rewired, with a new electrical boards and switchgear. All will be hidden away in a separate cupboard.
In the next couple of weeks, scaffold will be erected at the main frontage to carry out repairs to the stonework and to replace the porch roofing.

Thanks, everyone for your continued gifts and donations. Inspections have shown that considerable extra work is needed to repair the floor joists and add new floor supports as well as additional repairs to the main church frontage. If you would like to contribute, please contact us using the details on the contact page.