Building Work Update

Outside, work is underway to re-point the stone joints at the building frontage and re-roof the porch.
Meanwhile inside, the big scaffold has been taken down and work to the floor begins, with insulation between the floor joists, plywood base, and new oak flooring. New heating and electrical installations are ongoing.